Close Menu
onyxguides.comonyxguides.com

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    What Is A Mirrorless Cameras

    April 13, 2026

    Camera a7S SONY

    April 13, 2026

    NEBULA D2040R Wireless Satellite Speaker Instruction Guide

    April 13, 2026
    Facebook X (Twitter) Instagram
    onyxguides.comonyxguides.com
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • About us
    • Terms & Conditions
    • Privacy Policy
    • FAQs
    • Contact us
    onyxguides.comonyxguides.com
    Home » Renzor HEEDU Replacement Pressure Switch Kit Installation
    Reznor

    Renzor HEEDU Replacement Pressure Switch Kit Installation

    By Gabriel SmithSeptember 11, 2025Updated:December 9, 2025No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Telegram Email
    Reznor-EEDU-Replacement-Pressure-Switch-featured
    Share
    Facebook Twitter LinkedIn Pinterest Email

    reznor-logo

    Renzor HEEDU Replacement Pressure Switch Kit

    Reznor-EEDU-Replacement-Pressure-Switch-product

    General Information

    • If a model (H)EEDU duct furnace manufactured before SEP 2003 requires a replacement pressure switch, this kit is designed to provide the hardware and instructions needed to install a functional replacement switch. Some components may not be used depending on when the heater was manufactured.
    • Refer to the installation manual provided with the heater for important safety information.

    Components

    Check the type of switch on the heater. If the pressure switch is metal, the entire kit is required. If the pressure switch is black plastic, the pressure switch (PN 205821) is the only component from the kit that is required. Ensure that all components listed in Figure 1 and listed in Table 1 are available before beginning installation. llation

    Reznor-EEDU-Replacement-Pressure-Switch-figure-1

    Reznor-EEDU-Replacement-Pressure-Switch-figure-1

    Table 1. Replacement Pressure Switch Kit (PN 177633) Components
    Item No. Component Description PN (Quantity
    1 Pressure switch #IS20232-5272 205821 (1)
    2 Silicone tubing Red, 8-1/4 inches long 177293 (1)
    3 Mounting bracket BX cable 177139 (1)
    4 Wire terminal Insulated, 1/4-inch 93911 (3)
    5 Terminal connector MMFA, 2-to-1 43926 (1)

    Installation

    Refer to Figure 2 and replace the pressure switch as follows:Reznor-EEDU-Replacement-Pressure-Switch-figure-2

    1. Turn off the gas and electric power.
    2. Locate anthe d remove existing pressure from the venton venter assthe embly on the rear of heater:
    3. Install wire terminals on each of three pressure switch wires, one black and two orange: the
      • Cut the existing terminal off the end of each wire. Do not shorten the wire any more than required; cuthe t only the terminal.
      • Strip end of each wire about 1/4 inch.
      • Cothe nnect replacement wire terminal to each wire using the wire crimper tool.
    4. Install replacement pressure switch:
      • For units with a metal pressure switch and aluminum tubing:
        1. The position replacement mounting bracket, the one that flanges with a small mounting hole, faces the pressure switch.
        2. Slide wires through the slot and fasten the cable connector to the bracket.
        3. Position replacement switch and bracket over the bottom mounting hole, and d secure the switch and bracket using screws removed in step 1—one in the bottom mounting d one in top mounting hole.
        4. Push one end of the replacement silicone tube to fit the fitting on the pressure switch. Push the other end over the existing aluminum tubing. Ensure that both ends are secure.
    For units with a metal pressure switch and silicone tubing
    1. Reconnect pressure switch wires: NOTE: On the Renzor HEEDU Replacement Pressure Switch Kit replacement pressure switch, there are two prong-type terminals: a single prong and a 2-to-1 prong labeled C1.
      • Connect the wire terminal on the black wire to the single prong on the pressure switch.
      • Slightly bend up one terminal on a 2-to-1 connection or from the kit so that insulated wire terminal will fit on each connection. Connect wire terminals on orange with the wires to the 2-to-1 connector and conthe nect to the labeled C1 on pressure switch. Ensure that the connector and terminals are secure.
    2. Tuthe rn ON gas and electric power.
    3. Light the eater in accordance with the lighting instructions.
    4. Check for proper operation.

    Limited Warranty

    Reznor LLC warrants to the original owner-user that this product will be free from defects in material and workmanship. This warranty is limited to twelve (12) months from the date of original installation, whether or not actual use begins on that date, or eighteen (18) months from the date of shipment, whichever occurs first.

    Manufacturer Replacement Parts Limited Warranty

    Reznor LLC warrants replacement parts for thirty (30) days after installation or thirteen (13) months from the date of shipment, whichever occurs first.

    Customer Support

    • Website: www.reznorhvac.com
    • Ph: 800-695-1901

    FAQs

    Q: What is the purpose of the HEEDU Pressure Switch Kit?

    By monitoring airflow or system pressure and regulating heater ignition and shutdown, the pressure switch guarantees safe operation.

    Q: Which Reznor units are compatible with this kit?

    Units from the HEEDU series are compatible with this kit. Prior to installation, always compare the model and serial number of the item with the kit specifications.

    Q: Is professional installation required?

    Indeed. The pressure switch is an essential part for safety. Unsafe operation, system shutdown, or warranty problems could result from improper installation.

    Q: Do I need to turn off the unit before installation?

    Of course. To prevent electrical shock or injury, turn off the electricity and let the machine cool fully before working on the pressure switch.

    Q: Can I bypass the pressure switch if it fails?

    No, it is quite risky to avoid the pressure switch. It will void the warranty and could lead to system damage, fire, or safety risks.

    Q: How long does installation usually take?

    For most users, installation takes approximately 30–45 minutes, depending on system accessibility and prior exp. erience

    Best Renzor Pressure Switch Kit 2025 HEEDU Pressure Switch Replacement Renzor HEEDU Kit Features Renzor HEEDU Pressure Switch Kit Renzor HEEDU Replacement Parts
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Gabriel Smith

    Related Posts

    Renzor OPT-GC Gas Conversion Parts Instruction Manual

    September 15, 2025

    Renzor LDAP Downturn Nozzle Kit Installation Instruction

    September 11, 2025

    Renzor CAUA Ignition Controller Replacement Kit Installation

    September 11, 2025

    Renzor RP-PRESS-SW Pressure Switch Kit Installation Guide

    September 11, 2025

    Renzor RPV, SCA, Venter Motor Replacement Kit Installation

    September 11, 2025

    Reznor SC High CFM Coversion Kit Installation Instruction

    September 11, 2025
    Add A Comment

    Comments are closed.

    Don't Miss
    Other

    What Is A Mirrorless Cameras

    April 13, 2026

    Introduction Mirrorless cameras are really cool because they do not have a mirror and optical…

    Camera a7S SONY

    April 13, 2026

    NEBULA D2040R Wireless Satellite Speaker Instruction Guide

    April 13, 2026

    AURZEN BOOM mini 4 Inch 1 Smart Projector Instruction Guide

    April 13, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Subscribe to Updates

    Follow us

    Facebook X-twitter Instagram Pinterest

    © 2025 All rights reserved Onyx Guide.